CIP are currently undertaking the design and build of a new food ingredient mixing facility in Reigate, Surrey.
Involving the installation of a mezzanine floor, incorporating heat and humidity controlled, food mixing labs, the first requirement was to strengthen the existing floor slab, which we discovered, was built on an old Land Fill Site.